Our research · November 2026
Even the most powerful AI
is only as good as the
architecture behind it.
We tested KYP against five of the most common ways of using AI, on real renewable energy projects, and let government regulators decide what counted as a problem.
1 · The test
Real projects.
Real regulatory findings.
We compared what each AI approach found in real permitting documents with what regulators flagged.
The question was simple: how much of what the regulators found could each AI approach uncover?
- 20 real projects
The developer’s own documents: impact studies, scoping reports, permit applications.
- 6 ways to use AI
KYP and five common alternatives, all on the same frontier AI model.
KYP · Frontier AI · RAG · GraphRAG · Advanced RAG · Agentic RAG - The regulator’s list
979 problems the authorities actually raised, written down before any AI ran.
- Who found the most?
Each approach scored on the share of the regulator’s problems it found.
- 4countries: Italy, UK, US, Spain
- 4+ GWof solar, wind and storage
- 5,111pages in three languages
- 13cases KYP had never seen, used for every result
2 · The results
KYP found about twice as much, in every case.
- Arrow Valley UK72%23%
- Deanmoor UK92%48%
- Lombardore IT80%45%
- Byers Gill UK77%43%
- Algiedi ES62%30%
- Guglionesi IT67%39%
- Valdemoro ES54%27%
- Potentia-Viridi US73%46%
- Perkins US47%23%
- Soda Mountain US92%69%
- Ascoli Mezzaluna IT83%61%
- Darden US62%42%
- Marta IT47%31%
3 · Why it matters
What you miss before signing, you pay for after.
Every problem in this test was raised by a regulator on a real project. Each one missed is a delay, a renegotiation or a write-down later.
- The regulator said
- Approve the wind farm only if erosion near water is controlled.
- What happened
- Frontier AI saw the stream, but not the risk.
Typical cost if missed1~3% of construction cost for erosion work nobody budgeted
This problem
- Frontier AIMissed
- KYPFound on p. 44
Whole project: regulator’s problems found
KYP read the whole document in 7 minutes.
- The regulator said
- Ground gas can’t be left out. It could build up in enclosed buildings on the site.
- What happened
- The report lists five old landfills on the site. Frontier AI noted the landfills, but not the gas risk.
Typical cost if missed2£60k–115k for a ground investigation before 15 ha of batteries go on piles up to 12 m deep, near old landfills
This problem
- Frontier AIMissed
- KYPFound on p. 222
Whole project: regulator’s problems found
KYP read the whole document in 8 minutes.
- The regulator said
- Application incomplete until the battery hazard data is provided.
- What happened
- The hazard list left out the lithium-ion batteries. Frontier AI missed the gap.
Typical cost if missed3$40k–100k+ for the battery fire testing the regulator is waiting for
This problem
- Frontier AIMissed
- KYPFound on p. 197
Whole project: regulator’s problems found
KYP read the whole document in 7 minutes.
Public permit cases, not customers. Typical costs are public figures, not from these projects. The UK site figures are from the developer’s own report.
¹ Stormwater magazine survey of 27 US states
² UK council ground-investigation tenders, Contracts Finder 2018–2024; site figures from the developer’s scoping report, pp. 67–68 and 222
³ SunLith Energy, UL 9540A test guide
- General AIYou can’t see what it missed
A general-purpose AI gives a short, confident summary that looks complete. Its gaps only show up later, when the regulator or the market finds them.
- With KYPEvery finding has its page
KYP links each finding to the exact sentence it rests on, so your team can check it in seconds.
- With KYPYou decide before closing
More of the real problems, found early, with the evidence attached: the basis for price, conditions or walking away.